091 327 0770 - 090 326 2566
info@hdsteel.com.vn

Hung Yen to Launch 9.3 Trillion VND Mega-Project: A New Heritage and Economic Corridor

Map of the heritage-connecting road along the Red River in Hung Yen, a strategic infrastructure project

Hung Yen province is on the verge of a historic infrastructure development milestone as it prepares to break ground on a mega-project: a road connecting cultural and tourism heritage sites along the Red River. With a total investment of up to 9.3 trillion VND (approx. $365 million USD), the project is not merely a transportation work but is expected to become a new growth driver, awakening the socio-economic potential of a riverside region rich in tradition but not yet developed to its full potential.

Project Scope and Strategic Importance

The project has a total length of nearly 56 km, passing through four districts and cities: Van Giang, Khoai Chau, Kim Dong, and Hung Yen City. The starting point connects to the Left Red River Dike in Xuan Quan commune (Van Giang), a strategic location adjacent to Hanoi's major metropolitan areas. The endpoint connects to the road linking Hung Yen and Thai Binh provinces.

The project's importance extends beyond the provincial level. It is a crucial link in forming an inter-provincial heritage axis, connecting major cultural and spiritual centers of Northern Vietnam, such as Thang Long (Hanoi) - Pho Hien (Hung Yen) - Tam Chuc (Ha Nam) - Bai Dinh (Ninh Binh) - Perfume Pagoda (Hanoi). The formation of this corridor will create an integrated and attractive tourism product, strongly promoting the smokeless industry for the entire Red River Delta region.

Multifaceted Economic and Investment Impacts

The project's implementation is predicted to create a multi-dimensional boost:

  • Real Estate: The road will unlock a vast land fund along the river, creating a new urban development axis. The areas it traverses, especially Van Giang and Khoai Chau, are expected to see strong growth in real estate value and attract large-scale urban and eco-tourism projects.
  • Tourism and Services: Shortening travel time and providing convenient access to historical sites like Pho Hien ancient town, Da Hoa temple, and Da Trach temple will be a lever for the tourism industry. Ancillary services such as hotels, restaurants, and resorts will have opportunities to flourish.
  • Industry and Logistics: The route creates a new transport corridor, parallel to National Highway 5 and the Hanoi - Hai Phong Expressway, helping to alleviate traffic and enhance connectivity for industrial parks in the province.

The scale of the project will demand a massive volume of materials for modern and future industries, from construction steel and cement to other advanced materials, opening up significant opportunities for suppliers in the sector.

Timeline and Challenges

According to the plan, the project will commence in 2025 and is scheduled for completion in 2027, with the main construction contract lasting 850 days. Currently, the Hung Yen Provincial Management Board for Transport Construction Investment Projects is urgently finalizing the last procedures, such as contractor selection and, crucially, site clearance.

The biggest challenge for the project is the extensive site clearance, affecting many households and agricultural lands. Furthermore, ensuring the construction quality of such a large-scale, technically complex project is another factor that requires strict supervision.

Conclusion: The heritage-connecting road along the Red River is not just an infrastructure project; it is a strategic move by Hung Yen to reposition its economic role within the Capital Region. If successfully implemented, the project will create a new, sustainable development space that harmonizes heritage preservation with modern economic growth.

Source: Information compiled and analyzed from the Hung Yen Provincial Portal, Vietnam Investment Review, and other economic news sources as of August 11, 2025.


Related Post

5052 Aluminum: O, H32 or H34, Bend Radius and Buying Mistakes

5052 Aluminum: O, H32 or H34, Bend Radius and Buying Mistakes

5052 aluminum sheet in O, H32 and H34 tempers differs clearly in strength, ductility...

Aluminium sheet price, week 41/2026: SMM A00 drops to 23,650

Aluminium sheet price, week 41/2026: SMM A00 drops to 23,650

Shanghai reopened after National Day with two down sessions: the SMM A00 aluminium in...

Decree 344: Incentives for Power Equipment Makers from 20 Oct

Decree 344: Incentives for Power Equipment Makers from 20 Oct

From 20 October 2026, Decree 344/2026/ND-CP opens a state ordering mechanism and ince...

Physical Properties of Aluminum: 1050, 3003, 5052 Data for Shops

Physical Properties of Aluminum: 1050, 3003, 5052 Data for Shops

Aluminum's physical figures differ between alloys, and each figure drives a concrete...

Aluminium sheet price, week 40/2026: SMM A00 eases to 24,030

Aluminium sheet price, week 40/2026: SMM A00 eases to 24,030

The SMM A00 aluminium ingot price fell in all three sessions of week 40/2026, closing...

Vietnam car market grows fastest in Southeast Asia in 8M 2026

Vietnam car market grows fastest in Southeast Asia in 8M 2026

Vietnam's car market sold 432,548 vehicles in the first eight months of 2026, the fas...

3mm Aluminum Sheet: Weight, Tolerance, Alloy and Buying Errors

3mm Aluminum Sheet: Weight, Tolerance, Alloy and Buying Errors

3mm aluminum sheet is the most requested thickness in the thin-to-medium range: stiff...

6061 aluminum plate: T6 vs T651, thickness and buying pitfalls

6061 aluminum plate: T6 vs T651, thickness and buying pitfalls

A6061 is a heat-treatable aluminium–magnesium–silicon alloy widely used for machine f...

Intra-Asia freight at record high before Golden Week 2026

Intra-Asia freight at record high before Golden Week 2026

Drewry's Intra-Asia Container Index closed at 1,491 USD/40ft on 24 September 2026, up...

Aluminium sheet price, week 39/2026: SMM A00 at 24,240 CNY/t

Aluminium sheet price, week 39/2026: SMM A00 at 24,240 CNY/t

The SMM A00 aluminium ingot price ended week 39/2026 at 24,240 CNY/t, up 60 CNY/t fro...